S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
255. The authorization holder must, within 24 months after the granting of the authorization by the Minister, start the production of brine.
O.C. 1252-2018, s. 255.
In force: 2018-09-20
255. The authorization holder must, within 24 months after the granting of the authorization by the Minister, start the production of brine.
O.C. 1252-2018, s. 255.